A complete Effluent Treatment Plant (ETP) and Sewage Treatment Plant (STP) installation for a district hospital, built to meet pollution-control compliance requirements.
Hospitals generate biomedical wastewater that must be treated before discharge. We designed and installed a combined ETP/STP system sized for the hospital's daily patient load and bed capacity.
The plant was commissioned with full documentation for pollution-control board compliance, and has since passed the hospital's periodic audits without issue.
| Client | Rajeev Mishra |
| Location | Basti, Uttar Pradesh |
| Category | ETP / STP Plant |
| Scope | Effluent & Sewage Treatment Plant |
| Duration | 6 Weeks |
| Year Completed | 2022 |
| Support | AMC & After-Sales Service |
The ETP/STP plant they installed for us runs smoothly and met every compliance requirement during our hospital audit. Highly recommended.